Public Notices

We will post Public Notices, including Notices to Bidders, on this page as they become available.

Clinton Community College

Clinton Community College Kitchen Renovation Project
Architectural/Engineering Services
Request for Proposals


Eastern Iowa Community College District’s Clinton Community College campus is in the process of securing professional architectural and engineering services for the design and development of plans and specifications for its Kitchen Renovation Project. The approximate 300 sq. ft. renovation will encompass redesign and renovation of CCC’s original kitchen into a Warming Kitchen concept with new serving flow and equipment. All utilities will need to be surveyed and revised to meet the needs of the new layout. All design concepts must meet the existing city codes and covenants as well as state, local and national building, electrical, plumbing, fire and ADA codes. Request for Proposal guidelines may be obtained at the Eastern Iowa Community College District Office, Attn: Cindy LaFrentz, 101 West 3rd Street, Davenport, Iowa 52801, Ph: 563-336-3345, Email: clafrentz@eicc.edu. Proposals will be accepted at the SCC New Urban Campus Reception Desk, 101 West 3rd Street, Davenport, Iowa, 52801 until 3:00 PM (CDT), May 31, 2019. The District reserves the right to accept or reject any or all proposals.

Download Full CCC Kitchen Renovation RFP

 

Scott Community College

 

Eastern Iowa Community Colleges – Scott Community College, Blong Technology Center Carpet Replacement Project, Davenport, Iowa.

Eastern Iowa Community Colleges (EICC) is accepting bids for its Scott Community College, Blong Technology Center Carpet Replacement Project, 8500 Hillandale Road, Davenport, Iowa. This project includes the removal and disposal of all of the existing Carpeting (+/- 20,000Sq. Ft.) and 4” Vinyl Wall Base (+/- 2,700 Lineal Ft.) from all of the affected rooms and areas per the flooring plan. Complete all floor and wall preparation per manufacturers recommended installation specifications for new Carpet tile and 4” Vinyl Wall Base installation. Removal of all furniture in preparation of Carpet and Vinyl Wall Base removal and replacement of furniture after installation is complete. (The owner will be responsible for the removal and re-installation of all technology equipment). Provide all materials, supplies, equipment, tools and labor for the installation of the new 2’x2’ Shaw Philadelphia Commercial Carpet Tile and new 4” Vinyl Wall Base per the plans and specifications provided. Clean up of all areas upon completion. A Pre-Bid meeting will be held onsite at 9:30 a.m. on Wednesday, May 29, 2019. Sealed bids will be accepted until 11:00 a.m., Friday June 7, 2019, at the SCC Blong Technology Center, Information Desk, 8500 Hillandale Road, Davenport, Iowa 52806. Bids will be opened and publicly read at that time. Plans and specifications may be obtained From City Blue Technologies, 4653 44th Street, Rock Island, IL 61201, Phone: (309) 277-3000, or from the Master Builders of Iowa online plan room website located at mbionline.com. There is a $25.00 deposit foreach plan set. Information can be obtained by contacting: EICC District Office, Attn: Cindy LaFrentz, 101 West 3rd Street, Davenport, Iowa 52801, 563-336-3345, e-mail: clafrentz@eicc.edu. Plans and specifications may be viewed at the EICC Urban Campus, 101 West 3rd Street, Davenport, Iowa 52801, 563-336-3345. The District reserves the right to accept or reject any or all proposals.

 

Eastern Iowa Community Colleges – Scott Community College, Blong Technology Center Parking Lot Repair Project, Davenport, Iowa.

Eastern Iowa Community Colleges (EICC) is accepting bids for its Scott Community College, Blong Technology Center Parking Lot Project, 8500 Hillandale Road, Davenport, Iowa. The scope of this project is to remove and replace +/- 5,500 sq. ft. of deteriorated parking lot concrete. The contractor shall layout and saw cut the existing concrete parking area, remove the damaged concreate, excavate to a depth of 1’-6”, replace the original sub-base with 6” of suitable compacted granular sub-base (sub-base can be recycled crushed PCC material), compact sub-base to support new PCC, install new ½” rebar 2’-0” OC, drill and install 24” x 1”steel dowels 16” OC-12” deep into existing concrete and secure with epoxy adhesive, place 12” of 4,500# PCC in the excavated area and finish per standard IADOT recommendations. Remove all debris from site and finish grade any damaged earth edges, per the plans and specifications provided. Clean up of all areas upon completion. A Pre-Bid meeting will be held onsite at 10:30 a.m. on Wednesday, May 29, 2019. Sealed bids will be accepted until 12:00 p.m., Friday June 7, 2019, at the SCC Blong Technology Center, Information Desk, 8500 Hillandale Road, Davenport, Iowa 52806. Bids will be opened and publicly read at that time. Plans and specifications may be obtained From City Blue Technologies, 4653 44th Street, Rock Island, IL 61201, Phone: (309) 277-3000, or from the Master Builders of Iowa online plan room website located at mbionline.com. There is a $25.00 deposit for each plan set. Information can be obtained by contacting: EICC District Office, Attn: Cindy LaFrentz, 101 West 3rd Street, Davenport, Iowa 52801, 563-336-3345, e-mail: clafrentz@eicc.edu. Plans and specifications may be viewed at the EICC Urban Campus, 101 West 3rd Street, Davenport, Iowa 52801, 563-336-3345. The District reserves the right to accept or reject any or all proposals.