Concrete work for foundation
and first floor of burn building.

Additional concrete work for
interior stairs and walls as
well as exterior stairs.

End of first day of iron
work.

End of 3rd day, studs on first
floor and sub-floor of second floor.

Day 5 work continues.

Day 5 annex has been added,
sub floor on second floor.

End of day 5.

End of day 5. The two-story
residential structure with
attic and one story annex.
There will be a burn room
on the second floor and one
in the annex.

Tuesday Nov. 11. All the
exterior siding is on, crew
working on doors and windows.
On the inside the second floor
burn room has been completed
with work started on the thermal
insulation for the ground floor
burn room.
|
|

Tuesday Nov. 11. View of east
side of burn building, door to
first floor burn room is open
(lower right side), red color of
door is the thermal liner for the
interior side of door. Balcony
to second floor, entry door to
second floor from balcony or
from annex roof. First floor
entry into residential, movable
wall partitions on the first floor
allow for reconfiguration of room.
Roof has safety rails for fall
protection. Dark area on
roof is 4’ X 4’ replaceable
chopout, one on each side
of building

Interior of burn room, first
floor annex. The thermal
panels and temperature
monitors are installed.

Stand pipe first floor.

Movable partition walls,
approximately three feet wide
and nine feet tall. The individual
panels are light enough one
person can move or remove as
needed. These walls allow the
training team to change the
configuration of the room.

Stairway from second floor
going down to first floor.

Second floor, looking at
common wall with burn room,
there are two entry doors to
the burn room.

Attic, to the right is hatch with
ladder from second floor, left is
shaft opening for vertical
rescue evolution.
|